VB Airsuspension
Upcoming events

NEW LOGISTICS CENTRE ALMOST READY FOR USE

Takes place on 05/08/2020

Growth in recent years has led VB-Airsuspension to outgrow its current premises at Frankenweg 3 in Varsseveld. This was why we had a new logistics centre built opposite our current premises to expand our operating surface. In addition to the head office, space has already been rented in four other locations to meet increasing demand for our products.

Last year, a 0.8-hectare plot of land was purchased opposite our head office. The past few months has seen the construction of the new logistics centre on this plot of land. Construction is almost complete. We are currently in the final phase, making it time to move our warehouse to the new premises.

The head office at Frankenweg 3 will remain the home base of the Engineering and Sales departments. Moving the warehouse and Purchasing and Quality departments frees up more space for the other departments. The Engineering and Testing & Workshop departments will be able to expand their testing areas, allowing us to test our products to an even higher level.

As well as expanding the test department at Frankenweg, a test track will soon be built at the new logistics centre. This test track is equipped with a wide range of road surfaces, enabling us to test our (air) suspension systems with maximum effectiveness.

Some facts about the expansion:

  • Company premises doubled
  • Size of logistics centre: 4,800 m2
  • In-house test track
  • The Operations, Warehouse & Assembly, Purchasing and Quality departments will be located on the new premises.


By expanding our operating surface, we will be able to provide you with even better service in the years ahead and are ready for further growth at VB-Airsuspension.

From the end of August, you will receive the parcels from VB-Airsuspension from our new location at Guldenweg 6 in Varsseveld.

Victor Benno